By Bruce P. Evans
The Preservation Steering Committee (PSC) had hoped work on Caboose 13 could start by the end
of the year, but the availability of funds has held things up until early January.
Now that funds have become available, work parties have been scheduled for all Saturdays in January. The initial
work is to remove the remains of the old roof covering (part had blown off during transport), identify and replace
wood sheathing that contained rot, and put on the new roof covering.
The reason for the delay was based on the desire to have an assurance that once the roof came off the caboose,
that we'd be able to expeditiously put a new one back on. Leaving the interior vulnerable to moisture was most
undesirable.
Wanting to have the caboose secured from the elements at the earliest possible time, the Board was polled about
moving unrestricted funds to the caboose rather than wait for additional donations. The Board did unanimously approve
this plan, but it was too late to schedule a work session before Christmas.
The new roof covering is a unique process, in that we are using the same materials and techniques used for the
original roof application in the 1920's! This process involves placing a layer of Irish felt which is treated with
Airbol. This is then covered with canvas which is stretched and tacked down with several thousand copper tacks.
The canvas is then heavily painted. This is the same application used by the Millerick Brothers on P&SR #8.
While considerably more work than roll roofing and tar, it is functionally better since it is more flexible, and
is historically correct.
Much work is needed just to get the caboose closed in and secured from the elements. All window glass needs to
be replaced, and both end doors require replacement. Builders Glass in Ukiah has offered to provide safety window
glass at a reduced cost. But we could use help with the manufacture of the two doors. If anyone out there has the
experience and equipment for this task, (or to help with any other aspect of the project) let us know through the
Society mail, e-mail or phone.
Work has continued behind the scenes while funding was being arranged. Doug Richter did some research for the PSC
and came up with a unique photo of #13 from the Richard Biermann collection. [At end of update] Photos of #13 are
scarce. This is only the third photo of this particular caboose known to exist. The shot is from December 12, 1955,
and puts the 13 at San Rafael. The photo also presents some questions, since the stencil lettering conflicts with Futura lettering also believed
to have been used in the 1950's, and a step board is clearly in place around the cupola which does not show in
other photographs.
Member Jim Gray prepared a planned cost curve based upon our proposed budget, and is also working on a timeline
schedule which will permit us to visualize what work should be going on at a certain time, and in what order. Both
of these tools should help to keep us on budget and on schedule.
Jeff and Don Millerick placed some additional cribbing under the caboose, to help stabilize it as work began, since
it sits pretty high off the ground and not on its trucks. Jeff has also donated an unmarked marker lamp (that sounds
wrong, but that's correct!) and an inspectors lamp.
Allen Tacy did the graphic layout design work for a new run of HO gauge model railroad flatcars of the 1940's era,
and forwarded that to Bill McClung in Colorado. Bill will be producing the flatcars, and donating them to the Society.
We will them sell them to raise funds for restoration of the caboose.
Now that work has started, donations--both financial and of materials and services--are much needed to keep this
work going. If you can help with financial or material donations--or want to work on the caboose--please e-mail
the Preservation
Committee.

Caboose #13 in San Rafael, December 12, 1955.
NOVEMBER 2000 UPDATE
By Bruce P. Evans
The caboose has been tarped for the winter. This is due to holes in the roof that were opened up during transport
from Pleasanton to Millericks. There is also an open hole for the stovepipe, and open windows in the cupola with
glass out. Our first efforts will be to (1) remove the existing roof covering, (2) repair some wood rot, (3) apply
a new roof covering. The roof covering is interesting, in that it will utilize the same materials and methods used
in the original construction. This consists of putting down a layer of Irish felt, treating that layer, putting
down a layer of canvas, stretching the canvas and securing it at the edge with copper tacks. The canvas is then
painted. Several people responded to the resource questionnaire, and we have about a dozen who are ready to go
to work on the caboose. The Board is arranging to move some funds so that work may start very soon. We hope to
have the first work session by the middle of December.
Anyone who is interested in working on the caboose may let us know through the Society phone, Post Office box,
or email NWPRRHS
Secretary.
Please email the Preservation Committee with your questions about our restoration efforts.
Direct Webpage comments and suggestions to NWPRRHS Webmaster
This page was created on May 22, 2002
and last updated on May 25, 2002